Mechanical Division

Mechanical Circle Ladakh H/Q Kargil was established by the Jammu and Kashmir Government in January 1997 and is a service department inherently playing the role of providing infrastructural facilities to all Engineering and Non Engineering Department engaged in development activities in Leh and Kargil District. The Superintending Engineer (Mechanical) is the head of the Circle (Department) who act as a controlling officer.

AREA OF RESPOSIBILITIES

  1. Snow Clearance

The Department undertake snow-clearance work of vehicular roads of the region by deploying men and machinery. The Department has been assigned the responsibility to maintain the road connectivity of various villages / blocks/ tehsil with the district headquarter during winter season:

PWD Road (including Kargil-Zanskar National Highway)= 1191 KM

PMGSY Road= 382 KM

Available Machinery:

Chain Dozer- 07 Nos.,Wheel Loader- 13 Nos.,Backhoe Loader- 15 Nos.,Snow-Plough -01 Nos.

 

  1. Central Heating System

The department has been entrusted upon for Installation/operation/ maintenance of central heating system of various hospitals in Kargil district and other Government institutions

  1. District Hospital Kargil
  2. Community Health Centre Sankoo
  • Community Health Centre Dras
  1. Community Health Centre Padum Zanskar
  2. 200 bedded hospital Kargil
  3. Community Health Centre Chiktan
  • Installation of central heating system to Govt offices / institutions

Besides the department has installed Oxygen Plants alongwith piping network for District hospital Kagil

  1. Lift Irrigation/ Water Supply Schemes

As the Public Health Engineering Division, and Irrigation Division in Kargil has no mechanical sub-Division under them, the mechanical part of work/scheme is always assigned to the Mechanical Department.  The Mechanical Department undertake job viz Design Procurement and installation Mechanical Pumps and allied equipment for Lift Irrigation Schemes and Water Supply Schemes:

Major Schemes (Running)

LIS Hardas Gund, Hardass Thang, LIS Baroo, LIS Minji, Saliskote etc

WSS Baroo Stage-1 & Stage 2, Mulbeg etc

Many new Lift Irrigation schemes of Irrigation and REW Department is under progress.

 

  1. Construction Machinery / Equipment

Chain Dozer, FE Loader, BH Loader, Road Rollers, Air Compressors, Mobile Workshop van, Truck, Tipper:

These machineries are hired on prescribed rates by Engineering, non-engineering Department and private contractors which in return generates revenue to the government. Besides these machine are engaged during natural calamity.

 

  1. Other Misc Works

Procurment of Specialised Machinery / Equipment for MC Kargil/ Health Department/ other Govt Departments.

S.No Designation       Name
1. Chief Engineer Er. Abdul Mutalib
2. Superintending Engineer Er. Skalzang Dorjee
3 Executive engineer Er. Mohd Hassan
4 TO to Executive Engineer Er. Nissar Hussain
5 Assistant Executive Engineer  Field Sub Division Er. Gulzar Ahmad
6 Assistant Executive Engineer Workshop Sub Division Er. Ghulam Hassan
7 Assistant Executive Engineer Zanskar Sub Diision Er. Akbar Ali
8 Assistant Engineer Mechanical Er. Mohd Jaffar
9 Junior Engineer Mechanical Er. Gayaz ud din
10 Head Draftsman Kachoo Anis Khan
11 Head Assistant Smt. Tsering Choskit
S.No Name of the scheme Objective Status Remarks
1 Snow Clearance To maintain the road connectivity of various villages / blocks/ tehsil with the district headquarter during winter season:

 

Completed  
2 Central Heating System

Hospital, schools and other government buildings

To ensure optimal temperature , maintain a comfortable and safe indoor environment for occupants(patient,staff, studends and visitors Completed  
3  Lift Irrigation/ Water Supply Schemes To provide a reliable and consistant water supply for irrigation, enhancing agricultural productivity Completed  
4 Procurement of heavy earth moving machineries These machineries are hired on prescribed rates by Engineering, non-engineering Department and private contractors which in return generates revenue to the government. Besides these machine are engaged during natural calamity Completed  
5 Installation of oxygen plant in various hospitals To ensure and reliable and continuous of medical oxygen Completed